Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing (34) Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B."COMPLY WITH DEPARTMENT ORDER effective · 2026-09-01
Re-stucco for residential buildings."COMPLY WITH DEPARTMENT ORDER effective date05/12/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-08-26
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separateexpress electrical permit for new pool luminaire is required, when applicable, except for one and two familydwelling). The subject pool shall comply with the Swimming Pool safety act, according to Health and SafetyCode 115920-115929 through Senate Bill 552.Electrical and Mechanical fees included. "COMPLY WITH DEPARTMENT ORDER effective date05/12/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE · 2026-06-22
200 AMP MAIN PANEL UPGRADE. "COMPLY WITH DEPARTMENT ORDER effective date05/12/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-06-02
Kitchen/bathroom (2) remodel for residential buildings (no structural changes). Window (6) and door (2) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. "COMPLY WITH DEPARTMENT ORDER effective date05/12/2026. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-05-18