[ePlan] Changes to approved set. Revised power and lighting floor plans; added 150kVA XFMR; added 400A panel; added 1 lighting inverter; updated service load calculations. Clouded changes only. · 2026-09-10
25044-10001-13672
Corrections Issued
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS. RELOCATING EQUIPMENT AND DUCTWORK. REMOVAL OF EXHAUST FANS. REVISED EQUIPMENT MAKE AND MODEL · 2026-09-08
25016-10001-21013
Verifications in Progress
Eplan: Supplemental permit to 25016-10000-21013 for architectural and structural revision to Tenant - 1 KITCHEN INFRASTRUCTURE RELOCATED TO NORTHWEST CORNER KITCHEN HOOD DESCOPED AND DEFERRED TO FUTURE TENANT IMPROVEMENT INFILL EXISTING OPENINGS AT NORTH FACADE FACING JEFFESON BLVD. REFINEMENT OF EXTERIOR PATIO FACADE WITH STOREFRONT AND WOOD OPENINGS,FURRED PILASTER ARCHITECTURAL FEATURES, AND REVISED FACADE COLOR. SEE A11.00FOR UPDATED RENDERINGS FOR REFERENCETENANT 1 AND TENANT 2 INTERIOR LI · 2026-09-01
METHANE MITIGATION LEVEL 1. · 2026-08-04
Changes to permitted set of plansPLAN CHECK ONLY[ePlan] Full plan check for a core and shell for a multi tenant restaurant space with new 400A 120/240V 3PH 4W service, sub panels, power and lighting. · 2026-06-23
PLAN CHECK ONLY. REVISIONS TO PREVIOUSLY APPROVED PLANS. REVISIONS TO POTABLE WATER AND WASTE&VENT SYSTEMS. RELOCATED FIXTURES AND WATER HEATER LOCATION ON POTABLE WATER RISER DIAGRAM AND MINOR EQUIPMENT CALL OUTS. RELOCATED WASTE/VENT EQUIPMENT AND COMBINED VENTS ON WASTE/VENT RISER DIAGRAM. · 2026-06-18
[ePlan] Full plan check for a core and shell for a multi tenant restaurant space with new 400A 120/240V 3PH 4W service, sub panels, power and lighting. · 2026-04-10
PLUMBING T.I. INLCUDES POTABLE WATER AND WASTE&VENT SYSTEMS. · 2026-04-08