26014-20000-01053
CofO in Progress
(N) LAUNDRY ADDITION TO (E) SFD PER ENGINEERING."COMPLY WITH DEPARTMENT ORDER effective date 08/27/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE" · 2026-07-28
SHORING FOR RETAINING WALLS PER SOIL'S REPORT · 2026-07-24
INSTALL CLOTHES WASHER, TANKLESS WATER HEATER AND GAS LINE FOR WATER HEATER. "COMPLY WITH DEPARTMENT ORDER effective date08/27/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-07-15
INSTALL CLOTHES DRYER AND MINI SPLIT A/C UNIT. "COMPLY WITH DEPARTMENT ORDER effective date08/27/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-07-15
Kitchen/bathroom (1) remodel for residential buildings (no structural changes). Window (3) and door (2) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) IB of Title 24. Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing · 2026-07-15
REWIRE 2 CIRCUITS, ADD 2 NEW CIRCUITS. "COMPLY WITH DEPARTMENT ORDER effective date08/27/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-07-15
REMOVE (E) RETAINING WALL AND REPLACE BY TWO NEW RETAINING WALL CONSTRUCTION TO EXISTING SFD (PN: #1956VN 20661) ALL WORK PER ENGINEER DESIGN WITH SOILS REPORT · 2026-07-15
GRADING FOR NEW RETAINING WALL · 2026-07-15