DELTA "3" CHANGES TO AN APPROVED SET PER INSPECTOR'S CORRECTION. CHANGES TO REFLECT ON THE FEEDER SCHEDULE, NUMBER OF FEEDERS, VOLTAGE DROP CALCS & SIZE OF EGC GROUND. (PLAN CHECK ONLY) Changes to approved plans : adding a 25HP fire pump ; relocate panel board from MSA to HP((((([EPLAN]PC for new apartment complex with subterranean garage, and a grade level parking. SCOPE IS 2500 AMP 120/208 V 3 P 4 W SERVICE, SWITCHBOARDS, ELEVATORES, MOTORS, HOUSE AND UNITE PANELS, EV CHARGERS, LIGHTING AND L · 2026-08-19
Plumbing-Pressure Vessel · 2026-07-02
Installation of emergency responder system (DAS) in 6 story apartment building which includes 1 amplifier, 1 power supply and 29 antennas · 2026-05-15
plan check only. changes to some of the unit duct routing. · 2026-04-14
INSTALL TWO (2) TYPICAL CABLED ELEVATORS. · 2026-03-31
Changes to approved plans : adding a 25HP fire pump ; relocate panel board from MSA to HP((((([EPLAN]PC for new apartment complex with subterranean garage, and a grade level parking. SCOPE IS 2500 AMP 120/208 V 3 P 4 W SERVICE, SWITCHBOARDS, ELEVATORES, MOTORS, HOUSE AND UNITE PANELS, EV CHARGERS, LIGHTING AND LIGHTING CONTROLS. TOTAL AREA 83,244 SQ FT. · 2026-03-26
NFPA 13 SYSTEM WITH STANDPIPES AND FIRE PUMP. 4" FIRE METER 4" BACKFLOW PREVENTER. · 2025-10-07
[ePlan] New fire alarm system with 1 FACP,1 ComD,350 FD,2 CP · 2025-09-25