Permits at 1111 S FIGUEROA ST

24 permits on file · Los Angeles, CA · from the official municipal record

25044-90000-14036 Permit Finaled

Install two(2) exhaust fans, one(1) fire-damper, and one(1) fire/smoke damper. · 2026-09-08

26041-90000-31155 Permit Finaled

Replacement and rewire of equipment · 2026-08-28

26044-90000-06351 Permit Finaled

Replace refrigeration system · 2026-08-24

ePlan: Supplemental to 21016-10000-18062 to revise the structural bracing of the parapet mounted antennas . And change of Engineer of Record . · 2026-06-15

Supplemental permit to 21016-10000-18062 to change the GC from: NEWGens to APEX SITE SOLUTIONS INC · 2026-06-11

26041-90000-22532 Permit Closed

Providing temporary/portable power for the FIFA WC Concert @ Crypto Arena 6/8-6/10 2026 · 2026-06-09

26044-10000-02846 Quality Review Completed

REFRIGERATION MACHINERY ROOM · 2026-03-27

24044-20000-02489 Permit Finaled

HVAC TI. INCLUDES SMOKE CONTROL SYSTEM. · 2026-02-03

25044-20000-01562 Permit Finaled

General HVAC TI. · 2025-12-19

24044-20000-06196 Permit Finaled

Provide new VAV boxes for redistribution of the air in the T. I. Space. · 2025-12-19

24041-10000-11781 Permit Finaled

[ePlan] Lakers locker room TI. New lighting, controls, receptacles, circuits. Total affected area is 7821 sqft. Plan check for energy. · 2025-12-18

24041-10000-04967 Permit Finaled

[eplan] INTERIOR TENANT IMPROVEMENT OF EXISTING ARENA BUILDING. ENLARGEMENT AND RELOCATION OF EXISTING LOCKER ROOM SPACES FOR THE NHL VISITING TEAM, NBA VISITING TEAM, RELOCATION OF EXISTING SUPPORT SPACES (XRAY, WEIGHTROOM, AND LAUNDRY ROOM), AND INTERIOR RECONFIGURATION OF EXISTING DRESSING ROOMS. PLAN CHECK FOR POWER AND ENERGY. BUILDING PERMIT NUMBER 23016-20000-42684, · 2025-11-19

24041-10001-04967 Permit Finaled

E-plan, Added panelboard HED3Revised feeder size & voltage drop calculation for panel HED3Show circuit HED2: 13,15,17 for existing overhead door to berelocated in General Storage 029.Revised load summary DHED · 2025-11-19

25041-10000-08384 Permit Finaled

E-PLAN. RENOVATION OF KINGS LOCKER ROOM, RESTROOMS, LOUNGE, CLASSROOM/OFFICE OF EXISTING ARENA BUILDING: PROVIDING NEW RECEPTACLES, POWER. PROVIDING NEW LIGHTING FIXTURES, LIGHTING CONTROL DEVICES. ADDITION OF NEW ELECTRICAL PANEL TO ACCOMMODATE NEW ADDED ELECTRICAL LOADS. FED FROM EXISTING ELECTRICAL SERVICE.PLAN CHECK FOR POWER AND ENERGY. B# 24016 - 20000 - 03672. · 2025-11-12

25043-20000-02576 Permit Finaled

Fire sprinkler TI. Add/relocate sprinkler heads with flex hose connections. · 2025-10-10

25043-20000-02298 Permit Finaled

Fire Sprinkler T.I. Add and relocate heads. · 2025-10-10

25042-20000-03031 Permit Finaled

Revision to approved plans for waste/vent. Original plans under 25042-20000-02211. · 2025-10-02

25042-20001-02211 Permit Finaled

Supplemental permit to change gas laundry to electric and add service sink. · 2025-10-02

25042-20000-02677 Permit Finaled

Plumbing TI for potable water. · 2025-10-02

25042-20000-02211 Permit Finaled

Plumbing TI for potable water and waste/vent. · 2025-09-29

25043-20000-02092 Permit Finaled

TI: Add and relocate fire sprinkler heads. · 2025-09-23

Revision to add sprinkler heads. · 2025-09-08

Add 1 hose valve. · 2025-08-14

23042-20001-05339 Permit Finaled

REVISION TO APPROVED PLANS: REVISED POTABLE WATER AND WASTE & VENT SYSTEMS.relocation and replacement of fixtures. · 2025-05-09

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.