electrical circuit · 2026-07-22
Elevator Modernization · 2026-06-15
RELOCATING 2 EXISTING DISCONNECTS 3 PHASE FOR 2 ELEVATORS. · 2026-06-04
Elevator Disconnect · 2026-06-04
[ePlan] Changes to approved set. Resubmittal of previously approved drawings due to inspector comments. Changes are field device additions (31) to the FACP and Power Supply 1. PC for clouded Delta 4 changes only. · 2026-03-06
EPLAN. PLAN CHECK FOR A FIRE ALARM SYSTEM. SCOPE OF WORK INCLUDES (1) FACP, 1 COMMUNICATOR, 1 ANNUNCIATOR, 5 POWER SUPPLY UNITS, 1 BATTERY CABINET AND 263 DEVICES · 2026-03-06
[EPLAN] ED-1 PROJECT. ATTENTION: Ricco LaChance and Son VuongTI FOR EXISTING MOTEL KITCHEN WITH AN APPROXIMATE AREA OF 1300 SF. SCOPE OF WORK INCLUDES PARTIAL POWER REPLACEMENT. EXISTING SERVICE IS 1200A 120/208V 3P 4W. EXISTING PANELS ARE TO BE REUSED WITH PARTIALLY REPLACED CIRCUITRY. NEW EMERGENCY LIGHTING IS TO BE INSTALLED BUT ALL OTHER LIGHTING IS EXISTING TO REMAIN. SEE ELECTRICAL APPLICATION 25041-10000-38232 FOR SCOPE OUTSIDE OF KITCHEN. THIS PROJECT MAY QUALIFY FOR AN EXPRESS PERMIT BU · 2026-02-17
HVAV T.I. WORK INCLUDES GENERAL HVAC AND INSTALLATION OF TWO TYPE-1 KITCHEN HOODS. · 2026-01-05
[eplan] Revision to approved Title 24 plans. Updated lighting controls, other changes not relevant to review.*** Update main circuit breaker, feeders and panels to 225A. Update Panel H2 to 42ckts. Add lighting control devices and notes. (per direction by inspector) *** · 2025-12-08
[ePlan] Supplemental for changes to approved T24 plans. Updated fixture schedule, power and lighting floor plans, revised T24 forms and panel schedules. Plan check for clouded changes only. · 2025-12-08
[EPLAN] PLAN CHECK FOR ENERGY COMPLIANCE ONLY. SCOPE OF WORK IS A T.I OF AN EXISTING RESIDENTIAL SPACE (COMMON AREA). SCOPE INCLUDES AN INDOOR LIGHTING AREA OF APPROXIMATELY 5,141 SQFT AND INCLUDES LIGHTING, CIRCUITS AND EQUIPMENT. · 2025-12-08
(ED-1) The order of panels H1-H4 has been revised to reflect the field condition, per inspector correction. The distance of each run has also been added. Note that no new equipment, outlets or fixtures have been added. · 2025-11-04
[ePlan] Plan check for T24 energy compliance only for existing commercial space TI. Scope of work includes new lighting, controls, receptacles, sub panels for temporary supportive housing space. Total affected area is 614 sqft. · 2025-08-27
Updated Panels H3 & H4 schedules for bathroom circuits for Units:305, 308, 317, 318405, 408, 417, 418Updated load calculations based on bathroom power circuit revisions. Delta 2Receptacles to show as existing (E) instead of (N).Removed proposed (N) lighting layout and circuit in living area and re-circuit as(N) bathroom receptacle/lighting circuit. · 2025-08-27
[ePlan] Changes to approved T24 set. Adding arc fault breakers to units that are being renovated; upgrading panels H3 and H4 to 225A; revised floor plan layouts. Clouded changes only. · 2025-08-27
[ePlan] Plan check only. Per the request of the electrical inspector. The single-line and calculations have been updated to reflect all of the various electrical permits that have been pulled (including express), so that it can be reviewed. This is not for any new/change scope. Simply to provide all of the information in one place and confirm that the electrical system can support all of the new/changed loads. · 2025-08-15
[ePlan] Plan check only. Revision of lighting control device to "or equal" due to availability constraints. · 2025-04-28
FIRE SPRINKLER T.I. ADDING/RELOCATING HEADS AND CHANGING SPRINKLER TYPE. · 2025-04-24