The project consists of the installation of two (2) Dual Port L3 EV Charging Stations in the parking lot area as well as the associated improvements, new service, conduit, wire necessary to support this effort. · 2026-09-09
Plan check for Hazardous Location Motor Fuel Dispensing Facilty, Installing 8 fuel dispensors, 4 turbines motors, existing 600A Service · 2025-04-08
EPLAN. PLAN CHECK FOR POWER AND LIGHTING. SCOPE OF WORK INCLUDES: (N) 600A 120/240, 3PHASE, 4 WIRE) SERVICE THAT IS CONNECTED TO AN EXISTING 600A DSITRIBUTION BOARD. NEW LIGHTING, CONTROLS AND CIRCUITS. TOTAL AFFECTED AREA IS: 7146 SQUARE FEET. · 2025-04-08
Plan check only for lost set of plans. Permit under master application.***Original Work Description***Plan check for Hazardous Location Motor Fuel Dispensing Facilty, Installing 8 fuel dispensors, 4 turbines motors, existing 600A Service · 2025-04-02
Plan check only for lost set of plans. Scope of work includes changes to lighting layout. ***Work Description***09-29-2023 Changes to an approved set of plan, changes include revised lighting plan and update Title 24 Calculation, all changes has been clouled as DELTA 3.Plan check only, permit covered under master application · 2025-04-02