Permits at 10505 W WASHINGTON BLVD 1-184

5 permits on file · Los Angeles, CA · from the official municipal record

26043-10001-01162 PC Approved

PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLAN UNDER 26043-10000-01162. REVISED SEISMIC BRACING CALCULATIONS. · 2026-09-03

NFPA 13 FIRE SPRINKLER SYSTEM WITH STANDPIPES AND BOOSTER PUMP. CONNECTION TO 6" FIRE SERVICE WITH DOUBLE CHECK BACKFLOW PREVENTER. · 2026-06-30

Plan check for potable water, booster pump, dranage waste/vent vent, sewage ejector, rainwater, sump pump, and low/medium pressure fuel gas systems. 6-inch water meter. Reduced Pressure Principle Backflow Prevention Assembly required. · 2026-05-18

GENERAL HVAC. INCLUDES PRODUCT CONVEYING EXHAUST. · 2026-04-28

EPLANMIXED USE BUILDING 4000A 480V/277V 3PH NEW SERVICE. FULL PLAN CHECKFIRE PUMP + (5) 500KVA XFMRSPLAN CHECKER NOTE TITLE 24 ENERGY FEES NOT ADDED IN SUBMITTAL PLEASE ADD TO FINAL FEES.Electrical plan check for new apartment building. Will be moving forward as 10525 not as 10505. Building permit #23010-10000-00914 · 2026-01-13

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.