[ePlan] Changes to approved T24 set. Panel R1 relocated. PC for clouded changes only. · 2026-08-22
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLAN 26044 - 10000 - 01322. REVISE MAKE/MODEL OF AC UNITS AND REVISE REFRIGERANT TYPE TO A1. · 2026-08-17
SUPPLEMENTAL TO PERMIT 25016-10000-35645 TO CAPTURE FIRE DEPT CLEARANCE FOR MEDICAL GAS STORAGE ROOM · 2026-07-14
FIRE SPRINKLER T.I. ADD/RELOCATE HEADS AND SEISMIC BRACING. · 2026-06-09
HVAC T.I. ADDITION OF NEW HP'S WITH A2L REFRIGERANT. BUILDING PERMIT NUMBER FOR THIS PROJECT IS: 25016-10000-35645 · 2026-04-14
PLUMBING T.I. FOR POTABLE WATER AND WASTE/VENT. EXISTING 1.5" WATER METER WITH (E) BACKFLOW DEVICE. · 2026-04-02
(EPlan) Title 24 plan check for energy only. Scope of work includes new lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 1,896 sf.***Project description per applicant*** INTERIOR TENANT IMPROVEMENT. CONSTRUCTION TYPE 1-A SPRINKLERED. PROPOSED HYPERBARIC OXYGEN THERAPY MEDICAL OFFICE. NOT LICENSED BY CDPH, EXEMPT FROM OSHPD-3. CHANGE OF USE FROM RETAIL TO MEDICAL OFFICE NO STRUCTURAL CHANGES. 2,055 SF NLA · 2026-03-30
INSTALLATION OF DUPLEX SUMP PUMP · 2025-07-15
LEVEL II METHANE GAS VENTING SYSTEM. · 2025-07-15
NEW SWIMMING POOL · 2025-07-15
NEW PLUMBING SYSTEM. WORK INCLUDES POTABLE WATER WITH A BOOSTER PUMP SYSTEM, WASTE & VENT WITH SEWAGE EJECTOR, MEDIUM GAS PRESSURE AND RAIN WATER SYSTEM WITH SUMP PUMPS. 4 INCH DOMESTIC WATER METER WITH 6 INCH BACKFLOW. 1-1/2 INCH DOMESTIC WATER SERVICE WITH 2 INCH BACKFLOW. · 2025-07-15
INSTALLATION OF RAINWATER HARVESTING SYSTEM · 2025-07-15
04-12-2022 Changes to an approved set of plan, changes include adding fire pump, reducing elevator motor size(feeder and OCPD), control panel "J", revied main service load calculation, update equipment layout on floor plan, update lighting in unit floor plan, update dimmer on unit floor plan. All changes has been cloulded as delta "C" *********Previouse Work Description***********INSTALL 3000 AMP 208V 3 PH SERVICE AND (1) 3000 AMP AND (1) 8000 AMP DISTRIBUTION BOARDS. INSTALL NEW PANELS AND EQU · 2025-06-25
Plan check for clouded changes. Adding new fire alarm devices. · 2025-06-25
Install (2) cabled elevators. · 2025-06-24
FIRE SPRINKLER AND STANDPIPE SYSTEMS WITH FIRE PUMP FOR APARTMENT BUILDING. 6" FIRE SERVICE. 6" BACKFLOW DEVICE. · 2025-06-18
Eplan Sump pumps are added, EF-1 is added, control panel SP has been renamed to SP1. Please seethe following sheets.1. E2.0 for single line diagram, feeder schedule, and load calculations.2. E2.2, E2.4, and E2.5 for panel schedules.3. E2.6 for voltage drop and fault schedules.4. E4.0 and E5.0 for floor plans. · 2025-06-18
The following are changes made to an approved set. Please see following changes under Delta F: Electric ovens have been added to dwelling units. Please see the following sheets.1. E2.0, E2.1, and E2.2 for load calculations.2. E2.6 for voltage drop schedule.3. E13.0 through E13.5 for unit plans and panel schedules. Decorative wall sconces have been removed from the hallways, tap primers have been added onthe plans, and circulation pumps have been revised. Please see the following sheets.1. E2.4 a · 2025-06-18
375 kW diesel generator for temporary power for construction with 1200A 208Y/120V 3ph-4w distribution. Plan check for power. · 2025-06-18
GENERAL HVAC WITH GARAGE VENTILATION · 2025-06-13
[EPLAN] PLAN CHEKC FOR CHANGES TO AN APPROVED STE OF PLANS, CHANGES INCLUDE REIVIONS TO FLOOR PLANS AND UPDATING LOAD SUMMARY TO REFLECT REVISED CIRCUITS, ALL CHANGES ARE CLOUDED AND A NARRATIVE HAS BEEN PROVIDED. · 2025-06-01
PLAN CHECK ONLY. REVISION TO BASIN MATERIAL, DUPLEX SUMP PUMP MAKE/MODEL, AND CALCULATIONS. PREVIOUSLY APPROVED PLAN AND PERMIT UNDER #24042-10000-13130. · 2025-05-08
[EPLAN] New Fire Alarm system to a 7 story building, using 362 FA devices and (1) FA panel. · 2025-05-08