26043-10000-04143
Corrections Issued
FIRE SITE WORK ONLY. INSTALLATION OF A 6" UNDERGROUND FIRE WATER LINE. 6" FIRE METER AND 6"BACKFLOW DEVICE. · 2026-09-08
Install new DX split-system fan coil units and roof-mounted condensing units serving all interior spaces; roof-mounted exhaust fans for restrooms, custodian, and food prep areas; supply, return, and exhaust ductwork with associated dampers, grilles, and diffusers; refrigerant piping and condensate drain piping; equipment controls and thermostats; and testing · 2026-08-17
Install new domestic water, sanitary waste and vent, and storm drain piping systems; installation of public restroom, kitchen, and shower plumbing fixtures; electric domestic water heater; and associated piping and equipment. · 2026-08-17
*eplan*Grading- site grading, R&R for new building. · 2026-08-05
26030-10000-05321
Corrections Issued
ePlan, Rough site grading for a 1-story building (under 24010-10000-01138) with an estimated net fill of 292 CY · 2026-08-04
[eplan] 1200A 208Y/120V 3ph-4w service, distribution, power, and lighting for new commercial office building. Plan check for power and energy.*** New one-story, Type V-B construction, commercial building owned and to be operated by the Los Angeles Department of Water and Power. Program includes: public counters, waiting area, offices, and multipurpose room. Surface parking lot accommodates (6)-parking spaces and (6)-EV charging stations. *** · 2026-07-30
*eplan*CMU wall for trash, recycling enclosure, and fence wall 6.5'ht.. · 2026-07-29
Installing (1) single phase 200a 240v overhead commercial meter and (1) single phase 200a 120/240v distro panel for temporary power. · 2026-07-24
*eplan*1. New one-story, Type V-B construction, commercial building owned and to be operated by the Los Angeles Department of Water and Power. Program includes: public counters, waiting area, offices, and multipurpose room. Surface parking lot accommodates (6)-parking spaces and (6)-EV charging stations.(no cooking facility in the building) · 2026-07-24