Installation of 46.40KW/DC Photovoltaic system on the roof.80 Q-cell 580W panels with 1 Solar Edge 50KW Inverter & 80 S650 Optimizer · 2026-09-09
Plan check for two new typical cabled elevators. · 2026-07-27
SUPPLEMENTAL TO 23010-10000-03578 TO CAPTURE KITCHEN AND BATHROOM TYPE REVISIONS. REPLACEMENT OF FCP PANEL TO DEKTON AT EXTERIOR ELEVATIONS AND RISER REVISION TO STAIR #2. · 2026-07-14
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS UNDER #25043-10001-04443. ADDING SWAY BRACING CALCULATIONS FOR 2" CPVC LINE. PERMIT UNDER #25043-10000-04443. · 2026-06-25
PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS. REVISED FIRE SERVICE LOCATION, ADDED WATER CURTAIN HEADS AND REVISED HYDRAULIC CALCULATIONS. · 2026-05-22
PLAN CHECK ONLY. REVISION TO TITLE 24 SHEETS DUE TO CHANGE OF WATER HEATERS. PERMIT UNDER 24044-10000-13946 · 2026-05-19
REVISION TO PREVIOUSLY APPROVED PLAN UNDER 24042-10000-16759 & 24042-10001-16759 INCLUDES ADDING (2) HUB DRAINS, CHANGING THE WATER HEATER MAKE/MODEL, AND ADDING MEDIUM PRESSURE GAS SYSTEM. · 2026-05-14
[ePlan] New fire alarm system with (2) FACP and (497) FA Devices. · 2026-04-24
Plan Check Only. Revision to previously approved plan under 24042-10000-16759. Revision of the Material of Schedule to allow PVC for underground waste and stormwater drainage · 2026-02-24
Revisions to the single line related to the electric boilers (now gas), fixture schedule & cut sheets, title 24, and addition of dishwashers in the unit plans. · 2026-02-10
NEW FIRE SPRINKLER SYSTEM PER NFPA 13. INCLUDES 4" FIRE METER AND 4" DC BACKFLOW. · 2025-12-04
NEW HVAC SYSTEM. · 2025-10-07
Plan check for potable water, drainage waste/vent, booster pump, sump pump, and rainwater systems. Approved Reduced Pressure Principle Backflow Prevention Assembly required. 4-inch water meter. 4-inch potable water service line. · 2025-07-02
[E-Plan] 2 new 2000A services for 100% affordable housing development. Branch circuitry, lighting, and T24 included. 128units · 2025-04-22