26016-30000-15870
Verifications in Progress
INTERIOR TENANT IMPROVEMENT TO FIRST (AND SECOND?) STORY OF EXISTING OFFICE BUILDING · 2026-09-04
Tenant improvement of 1st & 2nd floors in existing office. Remodel of interior office spaces & restrooms. No change in use, occupancy · 2026-09-04
(EPlan) Title 24 plan check for energy only. Scope of work includes new lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 2028 sf. REMODEL OF AN EXISTING OFFICE AREA OF APPROXIMATELY 2000SF ON THE 5TH FLOOR OF AN EXISTING FIVE STORY, LOW-RISE BUILDING. NEW POWER, LIGHTING, AND LIGHTING CONTROLS TO BE FED FROM EXISTING PANELS. · 2026-09-04
[E-Plan] Energey and emergency lighting plan check REMODEL OF AN EXISTING OFFICE AREA OF APPROXIMATELY 3271SF ON THE 3RD FLOOR OF AN EXISTING FIVE STORY, LOW-RISE BUILDING. NEW POWER, LIGHTING, AND LIGHTING CONTROLS TO BE FED FROM EXISTING PANELS. · 2026-09-04
Phase 1 Includes supporting HVAC AH Replacement, removing (2) 10 Ton Condensing Units, (2) Air Handling Units. Relocating (1) 10 Ton Condensing Unit, Adding (1) Air Handling Unit and (6) Variable Air Volume Boxes with Reheat Coils and (3) Added reheat coils to existing variable air volume boxes. New Panel, fused disconnects, junction boxes and feeders. existing service to remain. · 2026-08-21
REPLACE TWO (2) EXISTING 20 TON AIR HANDLERS WITH ONE (1) NEW CUSTOM AIR HANDLER. REMOVE TWO (2) CONDENSER UNITS. RELOCATE (1) CONDENSER UNIT. REPLACE EXISTING VAV BOXES VAV-3 AND VAV-4 WITH PARALLEL FAN POWERED VAV BOXES WITH ELECTRIC REHEAT. REVISE AIR DISTRIBUTION IN ROOM 224. SPLIT VAV-2 INTO TWO ZONES BY ADDING ANEW VAV BOX. INSTALL FOUR (4) NEW VAV BOXES WITH ELECTRIC REHEAT. PROVIDE ELECTRIC REHEAT COIL TO VAV-6-1. · 2026-08-20
AT THE OWNERS REQUEST, SUPPLY AND INSTALL A COMPLETE CLEAN AGENTSYSTEM. SYSTEM SHALL INCLUDE THE INSTALLATION OF AN ADDRESSABLECONTROL PANEL, AREA SMOKE DETECTION, MANUAL CONTROL DEVICES, AUDIBLE /VISUAL NOTIFICATION DEVICES, MAIN AND RESERVE AGENT STORAGE CYLINDERS,AND DISCHARGE PIPING. · 2026-08-14
demolition of existing ductwork and air devices, relocation of existing ductwork and air devices as required, and furnishing/installing new ductwork and air devices per plan · 2026-08-13
[ePlan] Power plan check. Replace uninterruptible power supply (UPS) module with smaller unit. · 2026-08-01
Early start demolition of existing office space on levels 2 & 3 of an existing office building · 2026-07-28
replacing (5) Boilers · 2026-07-16
Replacing (5) Boilers · 2026-07-16
1. 4 Storm Drain below ground of PVC SDR-35 pipe and Solvent Weld Fittings, point of connection to existing nearest storm drain.2. 3 perforated pipes in planters below ground to be PVC SDR-35 pipe and Solvent Weld Fittings, including area drains.3. Install (2) 3/4" cold water lines below ground one for each new water feature, connecting from existing nearest water line, including (2) 3/4" ball valves, one at each side of water feature.4. 2" Fountain Return line PVC Schedule 80 pipe. · 2026-06-24
Demo/rework of existing ductwork and air devices, installation of new VAV-zone air distribution, and air balancing for the suite 1650 office build out · 2026-06-23
Installation of low voltage conduit, wires and devices · 2026-05-29
[ePlan] Requesting plan check for T24. Total affected area is 2,423 sf. REMODEL OF AN EXISTING WORK STATION SPACE WITH AN AREA OF APPROXIMATELY 2400SF ON THE 4TH FLOOR OF AN EXISTING FIVE STORY, LOW-RISE BUILDING. NEW LIGHTING AND LIGHTING CONTROLS TO BE FED FROM EXISTING PANELS. T24 REVIEW ONLY. · 2026-05-27
OFFICE TENANT IMPROVEMENT PROJECT ON 3RD FLOOR OF EXISTING BUILDING. NON-STRUCTURAL T.I., INCLUDING NEW INTERIOR NON-STRUCTURAL PARTITIONS, DOORS, AND FINISHES. AREA OF WORK FOR VALUATION PURPOSES: 1,189 SF. · 2026-05-20
Temporary Install of 800A & 400A distribution boards · 2026-05-15
Low-side ductwork modifications, new air distribution, t-stat relocations · 2026-04-21
Replace governor rope on car with State number 103985 · 2026-04-20