Permits at 1013 N SYCAMORE AVE

14 permits on file · Los Angeles, CA · from the official municipal record

26046-10000-01118 Corrections Issued

INSTALLATION OF (1) HYDRO-ELECTRIC ELEVATOR.***Note from applicant: ADDRESS SHOULD BE LISTED AS 1011 N. SYCAMORE AVENUE, LOS ANGELES, CA 90038. PLEASE UPDATE ACCORDINGLY. ---> PC to verify address) · 2026-09-10

*EPLAN*Supplemental to: 24010-10000-04174 TO CAPTURE REVISIONS FOR ALL THE FOLLOWING: UPDATE TO TRANSFORMER PAD SIZE AND LOCATION, ADJUSTMENT TO PARKING LOCATION AND COUNT, ADDITION OF COLUMN AT CANTILEVER CORNER, REVISIONS OF CURB CUT LENGTH BOLLARDS PROVIDED AT DRIVE AISLES AND ADDITION OF ROOF ACCESS LADDER. CAL OSHA CLEARANCE CAPTURED UNDER THIS SUPPLEMENTAL. · 2026-09-04

[eplan] Supplemental Plan check for 24041-10000-55403. Adding outdoor lighting to canopy. · 2026-07-23

24010-10001-04174 No Progress

EPLAN***PDPP FOR REVIEW OF GREEN, ACCESSIBILITY FLS AND STRUCTURAL (PLAN CHECK ONLY)****SUPPLEMENTAL TO 24010-10000-04174NEW CONSTRUCTION 2-STORY ABOVE-GRADE CORE AND SHELL OFFICE BUILDING WITH BUSINESS USE (B) OF APPROXIMATELY 30,000 SF WITH SURFACE LEVEL PARKING***SPRINKLERED THROUGHOUT NFPA-13 · 2026-07-21

LOW VOLTAGE -CCTV & ACCESS CONTROL · 2026-06-11

25042-10002-07836 PC Approved

PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLAN UNDER 25042-10000-07836. REVISED BFP MAKE AND MODEL AND REVISED POTABLE WATER RISER DIAGRAM. · 2026-06-10

25043-10001-04811 PC Approved

PLAN CHECK ONLY. PERMIT IS UNDER #25043-10000-04811. ADDING (1) SPRINKLER HEAD AND ADDING SEISMIC BRACING CALCULATIONS. · 2026-05-28

CORE AND SHELL GENEREAL HVAC · 2026-03-02

FIre alarm system for new commercial space. · 2026-01-28

REVISION TO PREVIOUSLY APPROVED PLANS UNDER #25042-10000-07836. INCLUDES UPDATED POTABLE WATER RISER DIAGRAM BY REMOVING FIXTURES, UPDATED WASTE&VENT RISER DIAGRAM, AND ADDED BACKWATER VALVE TO WASTE&VENT RISER DIAGRAM. · 2026-01-07

[eplan] Supplemental Plan check for 24041-10000-55403. Reduced Service Size to 1600A, relocation of Main Meter Room per LADWP Coordination, added Outdoor Lighting, and miscellaneous changes due to Value Engineering and minor Architectural Background adjustment. Changes made to lighting floor plan, power floor plan, panel schedules, and single line diagram. New power loads added. · 2025-12-29

NEW NFPA 13 FIRE SPRINKLER SYSTEM. 6" FIRE METER. · 2025-12-22

[E-Plan] SHELL AND CORE POWER & LTG. FOR A NEW 2 STORY, 30,000SF COMMERCIAL RETAIL BLDG. W/ A NEW 2500AMPS, 208Y/120V, 3PH-4W SERVICE . SCOPE OF WORK INCLUDES GEN POWER AND LIGHTING BRANCH CIRCUITING INCLUDING ENERGY TITLE 24 COMPLIANCE. ALL EQUIPMENT & DEVICES ARE NEW. · 2025-09-18

PLUMBING CORE AND SHELL. WORK INCLUDES WASTE AND VENT SYSTEM AND POTABLE WATER, 2" DOMESTIC METER WITH BACKFLOW. · 2025-08-19