PLUMBING TI. ADDITION OF FIXTURES FOR POTABLE WATER AND WASTE/VENT. 3" METER NO BACKFLOW. · 2026-01-13
REVISIONS INCLUDE ADDING A SPLIT SYSTEM, ENVIRONMENTAL EXHAUST, AND DUCTWORK. PREVIOULSY APPROVED PLANS UNDER #21044-10000-16961 & 20044-30000-00310. · 2025-12-12
REVISION INCLUDES ADDING TWO SPLIT SYSTEMS. PREVIOUSLY APPROVED PLAN UNDER 20044-30000-00310. · 2025-12-12
REVISION TO PREVIOUSLY APPROVED PLANS UNDER 23042-10000- 23986. ADDING DRAINS AND COMBINING DRAIN LINES SERVING BUILDING AND SITE DRAINAGE INTO ONE. · 2025-09-08
Plan check for building B which is fed from the 2000A service. Buiding B 1000A switchboard serves 39 unit panels. Full power plan check for a core and shell 11 unit apartmemt building located on the west side. Scope of work includes new 2000A service rated for 120/208V, 3phase, 4w, feeding 11 units of the apartment building A & 39 units for Building B. This of 2 of 2 buildings of the total 50 unit apartmnent building per building permit. 20041-10000-11743Both plans will be assign to one plan c · 2025-08-24
[EPLAN] PLAN CHECK FOR CHANGES TO APPROVED SET UNDER 20041-10000-11771. CLOUDED DELTA 4 CHANGES ONLY. CHANGE TO LOAD CALCS, PANEL SCHEDULES, AND LIGHTING FLOOR PLANS. FOR BUILDING B ONLY. Supplemental submission for revised emergency lighting and Building B, 3rd floor public restroom lighting.Attempted to create supplemental permit but these permits were prior to the ePlan ramp up and are not in the system.Orig. Permit Bldg. B 20041-10000-11771 · 2025-03-30