Permits at 1002 N ALFRED ST

25 permits on file · Los Angeles, CA · from the official municipal record

21010-10000-00744 CofO in Progress

NEW 5-STORY, 67 UNIT TYPE III-A APARMTENT BUILDING OVER ONE LEVEL TYPE 1-A SUBTERRANEAN PARKING GARAGE . (affordable units : six (6) Extremely low income units, and one (1) low income unit)"COMPLY WITH DEPARTMENT ORDER effective date12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE" · 2026-09-08

21030-10000-01566 Permit Finaled

EARLY START PERMIT FOR SITE PREPARATION & EXCAVATION & BACKFILL FOR NEW 5 STORY, 67 UNIT TYPE III-A APARMTENT BUILDING OVER ONE LEVEL TYPE 1-A SUBTERRANEAN PARKING GARAGE . ( BY RIGHT PROJECT) TOTAL 10946 C.Y.COMPLY WITH DEPARTMENT ORDER effective date12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE" · 2026-09-04

26047-20000-00027 Verifications in Progress

PRE FAB SPA IN COMMERICIAL BLDG · 2026-06-22

26042-10000-09012 Quality Review Completed

PLUMBING T.I. POTABLE WATER, WASTE/VENT, AND LOW PRESSURE GAS. ORIGINAL APPROVAL UNDER 23042-10000-26437. ****15 ADU CONVERSION UNDER 24016-10000-32224**** · 2026-06-15

26041-10000-17388 Permit Finaled

Installation of 5 new EV chargers serviced by existing EV panelTotal load not to exceed 400 amps Level 2 · 2026-06-15

23042-10000-26239 Permit Finaled

STORM DRAINAGE SYSTEM WITH 3 DUPLEX SUMP PUMPS. · 2026-06-11

23042-10003-26437 Permit Finaled

SUPPLEMENTAL PERMIT TO 23042-10000-26437 TO ADD WORK: GAS SUB-METERS 83 PIECES"COMPLY WITH DEPARTMENT ORDER effective date 12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". All permits shall be for the same time period limitation. If additional assistance is needed, please call Inspector EDMUND LUM at (213)252-3959 of CONTRACT NUISANCE ABATEMENT. CEIS Case Number is 975009. · 2026-06-11

21020-10000-00464 Permit Closed

EARLY START PERMIT FOR TEMPORARY SHORING WITH LAGGING & SOLDIER PILES FOR NEW 5-STORY, 67 UNIT TYPE III-A APARMTENT BUILDING OVER ONE LEVEL TYPE 1-A SUBTERRANEAN PARKING GARAGE .COMPLY WITH DEPARTMENT ORDER effective date12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE" · 2026-06-11

26042-20000-00206 Permit Finaled

Installation of a new spa piping system · 2026-06-10

26041-20001-17454 Permit Finaled

SUPPLEMENTAL PERMIT TO #26041-30000-17454 TO ADD:2 PUMPS/MOTORS, 1 NEW BRANCH CIRCUIT, AND A SUB PANEL. "COMPLY WITH DEPARTMENT ORDER effective date 12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE" · 2026-06-08

26041-30000-17454 Permit Finaled

INSTALL POOL LIGHT. "COMPLY WITH DEPARTMENT ORDER effective date12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-06-08

23042-10000-26437 Permit Finaled

POTABLE WATER, WASTE/VENT WITH SEWAGE EJECTOR, AND LOW PRESSURE GAS. CONNECTION TO 4" DOMESTIC WATER METER WITH BACKFLOW PREVENTER. · 2026-06-04

23044-10000-30833 Permit Finaled

GENERAL HVAC WITH GARAGE VENTILATION · 2026-05-29

22041-20000-68433 Permit Finaled

PC FOR A NEW 83 UNIT 5 STORY MULTIRESIDENTIAL BUILDING (AS PER BUILDING APPLICATION IT IS 67 UNIT BUILDING PLAN CHECKER TO VERIFY DURING PC). SERVICE SIZE IS 1600A 208/120V 3P 4W, DISTRIBUTION BOARDS, ELEVATORS, EV CHARGERS, EMERGENCY UPS, HOUSE PANELS, UNIT PANELS, LIGHTING AND LIGHTING CONTROLS FOR 55899 SQFT AREA.PER B# 21010-10000-00744:NEW 5-STORY, 67 UNIT TYPE III-A APARMTENT BUILDING OVER ONE LEVEL TYPE 1-A SUBTERRANEAN PARKING GARAGE . PER B#21010-10001-00744: ***ATTN: GARO TELMI***SU · 2026-05-27

22041-10001-68433 Permit Finaled

[eplan] Revisions to approved plans. Additional subpanel and loads. Updated SLD, load calculations, updated panel schedules, power/lighting plans, etc. · 2026-05-27

26041-10000-16685 Permit Finaled

INSTALL 2 WAY COMMUNICATION · 2026-05-26

25041-10000-49616 Permit Finaled

[ePlan] Changes to an approved set. Revisions include: updated feeders and calculations, and added panel and circuits.ORIGINAL PERMIT SCOPE NEW 1600A SERVICE FOR MULTIFAMILTY RESIDENTIAL BUILDING · 2026-05-26

25041-30000-07710 Permit Finaled

PERMIT FOR 85 LOW VOLTAGE DEVICES · 2026-05-26

24041-20000-16452 Permit Closed

INSTALLING (1) SINGLE PHASE 200A 240V O/H COMMERCIAL METER FOR A TEMPORARY POWER POLE. "COMPLY WITH DEPARTMENT ORDER effective date12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-05-26

24041-10000-43062 Permit Closed

INSTALL A TEMP. GENERATOR FOR CONSTRUCTION"COMPLY WITH DEPARTMENT ORDER effective date12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-05-26

25046-10000-01602 Permit Finaled

INSTALLATION OF (2) CABLED ELEVATORS. · 2026-05-14

23042-10005-26437 PC Approved

PLAN CHECK ONLY. REVISION TO PREVIOUSLY APPROVED PLANS UNDER #23042-10000-26437. POTABLE WATER SUB METER MODEL REVISION ONLY. · 2026-05-12

24043-10000-03985 Permit Finaled

INSTALL A NEW SPRINKLER SYSTEM PER NFPA 13 WITH MANUAL STANDPIPES. 4-INCH FIRE METER WITH 4-INCH DOUBLE CHECK BACKFLOW PREVENTER. · 2026-04-30

26045-10000-00190 Permit Finaled

Hot water storage tank"COMPLY WITH DEPARTMENT ORDER effective date12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". · 2026-04-30

26045-10000-00087 Permit Finaled

HOT WATER STORAGE TANK "COMPLY WITH DEPARTMENT ORDER effective date12/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Allpermits shall be for the same time period limitation. Ifadditional assistance is needed, please call Inspector EDMUND LUMat (213)252-3959 of CONTRACT NUISANCE ABATEMENT. CEIS CaseNumber is 975009.(Created: IMSV7 / 12-14-22) · 2026-04-30