(Eplan) Plan check for service upgrade to 600A service, 34.5kV LA DWP outdoor equipment yard with outdoor 34.5kV meter and switchboard. · 2026-09-10
grading for Concrete service slab with CMU fence enclosing walls (open to sky) ancillary to the university's electrical infrastructure upgrade for safety purpose, to restrict public access to the new electrical equipment. · 2026-09-10
Eplan. Concrete service slab with CMU fence enclosing walls (open to sky) ancillary to the university's electrical infrastructure upgrade for safety purpose, to restrict public access to the new electrical equipment. · 2026-09-10
Replace existing main line disconnect, cable and wire on 6 Escalators. Also replace existing lights and gfi outlets in pits. · 2026-09-09
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 350 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. · 2026-09-02
Modernization of 6 escalators · 2026-08-25
26048-10000-00878
Verifications in Progress
RECONSTRUCTION OF CONCRETE SLAB LMU BLUFF SIGN PER SPECIFIC PLAN · 2026-07-29
26030-10000-05490
Verifications in Progress
[ePlan] SITE GRADIGN FOR RECONSTRUCTION OF CONCRETE SLAB LMU BLUFF SIGN · 2026-07-29
Add notification appliances on 1st floor due to tenant improvement and connect to existing remote power supply located on 1st floor. Add relay module for A/V shutdown and connect to existing FACP. Furnish shop drawings and programming for a fire alarm system shown on these drawings and as per contract drawings and specifications. The balance of the system will remain "as-is". · 2026-07-27
Install 4 temporary ground rods for temporary generators. · 2026-07-22
Valve & OSV Installation · 2026-07-21
Valve Replacement · 2026-07-21
(Eplan) Re-feed existing building from different 225KVA Transformer. · 2026-07-21
EXISTING WALL PERMITTED UNDER PERMIT #01020-10000-02131 ALTERED TO BECOME MONUMENT SIGN (LMU)LENGTH: 101.1 FT WIDTH: 2.92FTAREA COMBINED OF NORTH AND SOUTH WALL : 141.18 SQUARE FEETHEIGHT: 8 FT · 2026-07-08
26041-10000-23513
PC Info Complete
[Eplan] Full plan check for (1) 20 A 120V electrical circuit for an exterior signage lighting. Methane Zone Area. · 2026-07-02
Swimming pool light replacement and wiring repair · 2026-06-26
ePlan. Demo (e) Helipad · 2026-06-16
Gersten Pavillion2-350amp generator for temporary power no dwelling attachment · 2026-06-04
25041-10000-57712
PC Info Complete
(EPlan) Title 24 plan check for energy only. Scope of work includes new lighting fixtures, new lighting fixture controls, new power devices, and new circuits. Total area is 680 sf. · 2026-01-28
INSTALL ATION OF A CHILLER · 2025-10-30
[eplan] PLAN CHECK ONLY. Permit paid under express permit #25041 - 10000 - 24520. Power plan check. The electrical scope includes supporting an HVAC change out of (2) 500T Chillers for (1) 700T chiller as well as (1) 25HP Pump, (1) 75HP Pump, New Feeders and VFDs as required. · 2025-07-23
[eplan] Subpanels, power, and lighting for new expansion to (E) campus building. Plan check for energy.*** ELECTRICAL UPGRADES FOR ADDITION AND ALTERATIONS TO THE WEST SIDE OF THE EXISTING GERSTEN PAVILION, ON THE LOYOLA MARYMOUNT UNIVERSITY CAMPUS. *** · 2025-07-22