SPR 2019 CBRC - INTERIOR RENOVATION TO SEVEN (7) EXISTING APARTMENT UNITS WITH THE ADDITION OF ONE (1) ADU. EIGHT (8) UNITS TOTAL PROPOSED WITHIN AN EXISTING 3-STORY (3 STORIES ABOVE GRADE PLANE) MULTI-UNIT RESIDENTIAL BUILDING PER PLANS. WORK INCLUDES LOWERING BASEMENT FLOOR WITHOUT UNDERPINNING, NEW COVERED REAR WOOD STAIR AND PORCH. PROVIDE NEW CONCRETE TRASH ENCLOSURE. FIVE (5) EXTERIOR, EXISTING PARKING SPACES IN THE REAR YARD TO REMAIN. (CURRENT USE R-2/RESIDENTIAL, PROPOSED USE R-2/RESIDE · 2026-08-28
SELF-CERT 2019 CBRC: INTERIOR DEMOLITION OF NONSTRUCTURAL INTERIOR PARTITIONS AND MECHANICAL, ELECTRICAL, AND PLUMBING SYSTEMS AT AN EXISTING 3-STORY MASONRY BUILDING WITH BASEMENT.CURRENT OCCUPANCY: RESIDENTIAL (NO CHANGE)NEW SCOPE INTERIOR RENOVATION UNDER SEPARATE PERMIT AT A LATER DATE · 2026-03-27