PERMIT EXPIRES ON 10/27/2026 ERECTION STARTS: 9/2/2026, ERECTION ENDS: 9/8/2026. ERECTION STARTS: 9/2/2026, ERECTION ENDS: 9/8/2026. SELF-CERT 2019/2022 CCC: ERECTION STARTS: 9/2/2026, ERECTION ENDS: 9/8/2026. ERECTION STARTS: 9/2/2026, ERECTION ENDS: 9/8/2026. ERECTION STARTS: , ERECTION ENDS: SPR 2019/2022 CBC: ERECT ONE (1) TEMPORARY MOBILE STAGE SYSTEM USING THE "STAGELINE" STAGE MODEL # SL250 AT A SIZE OF 24' WIDE X 32' DEEP. THIS STAGE WILL BE ERECTED ON 09/02/26 AND DISMANTLED ON 09/08/ · 2026-08-27
TEMPORARY STRUCTURE: NEW INSTALLATION. STAGE/PLATFORM - ASSEMBLY - 384 SQ. FT. ELECTRICAL WORK = NO. NON-SEWER TOILETS: 6. INSTALL DATE: 8/15/2026; REMOVAL DATE: 8/16/2026. · 2026-08-04
SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO EXISTING SERVICE AREA TOILET ROOMS INCLUDING PLUMBING AND ELECRTRICAL (NO MECHANICAL WORK UNDER THIS PERMIT). LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), LOWER LEVEL. · 2025-12-17
SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO CONVERT EXISTING STORAGE TO NEW FAMILY RESTROOM. LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), MAIN LEVEL NEAR BUILDING ENTRY. · 2025-12-15
SCOPE: NONSTRUCTURAL INTERIOR ALTERATION TO EXISTING BREAK ROOM AREA INCLUDING PLUMBING AND ELECTRICAL (NO MECHANICAL WORK UNDER THIS PERMIT). LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), LOWER LEVEL. · 2025-12-10