SC 2019 CBRC SC 2019 CBRC: SCOPE OF WORK INVOLVES A MINOR, NON-STRUCTURAL INTERIOR RENOVATION TO UPDATE THE EXISTING FITNESS AREA AND CONVERT AN ADJACENT THEATER ROOM INTO A SECONDARY FITNESS SPACE. THE SCOPE INCLUDES REFRESHING INTERIOR FINISHES, PAINTING, INSTALLING NEW FITNESS EQUIPMENT, ADDING A NON-STRUCTURAL WALL AND DOOR IN THE COMMON AREA, AND REPLACING ELECTRICAL OUTLET COVER PLATES. ALL EXISTING PLUMBING, FIRE PROTECTION, CEILINGS, LIGHTING, AND EGRESS PATHS WILL REMAIN UNCHANGED WITH · 2026-06-30
SC 2019 CBRC: SCOPE OF WORK INVOLVES SELECTIVE DEMOLITION AND CONSTRUCTION, UPDATING INTERIOR FINISHES WITH NEW PAINT AND FLOORING. WHILE EXISTING MECHANICAL, ELECTRICAL, FIRE PROTECTION, AND LIGHTING SYSTEMS WILL REMAIN, THEY WILL BE MODIFIED, RELOCATED, OR SUPPLEMENTED WITH NEW OUTLETS AND FIXTURES AS REQUIRED TO MEET CODE COMPLIANCE AND FIT THE NEW ARCHITECTURAL CONFIGURATION. AS PER PLANS. (OCC. GRP. A-2 A-3 & R-2; CONST. TYPE 1-A). · 2026-06-30
SC 2019 CBRC: SCOPE OF WORK INCLUDES SELECTIVE DEMOLITION AND SUBSEQUENT CONSTRUCTION OF WALLS, CEILINGS, AND ELECTRICAL COMPONENTS. WHILE THE EXISTING MECHANICAL, FIRE PROTECTION, AND ELECTRICAL SYSTEMS WILL PRIMARILY REMAIN IN PLACE, MODIFICATIONS WILL BE MADE TO COMPLY WITH CODES AND FIT THE NEW LAYOUT, INCLUDING RELOCATING HVAC DIFFUSERS, ADJUSTING FIRE SPRINKLER HEADS, AND ADDING NEW ELECTRICAL OUTLETS. ADDITIONALLY, EXISTING CEILING TILES AND GENERAL LIGHTING WILL BE INTEGRATED WITH NEW GR · 2026-06-29