Permits at 337 E RANDOLPH ST

25 permits on file · Chicago, IL · from the official municipal record

101088108 ACTIVE

PERMIT EXPIRES ON 11/09/2026 ERECTION STARTS: 10/7/2026, ERECTION ENDS: 10/12/2026. CHICAGO MARATHON BLEACHERSSTRUCTURES- SELF-CERT, REINSTATE 101060266 1 DAY EVENT OCTOBER 11, 2026ERECT TWO (2) STRUCTURES- ONE (1) 84X13.5X9.5 BLEACHER, ONE (1) 132X13.5X14.5 BLEACHERSETUP 10/7/2026- REMOVE 10/12/2026ASSEMBLY · 2026-09-09

101088109 ACTIVE

PERMIT EXPIRES ON 11/09/2026 ERECTION STARTS: 10/7/2026, ERECTION ENDS: 10/12/2026. CHICAGO MARATHON MOBILE BLEACHERSMOBILE BLEACHERS- SELF-CERT, 1 DAY EVENT OCTOBER 11, 2026ERECT EIGHT (8) 39.75X17.3X11 MOBILE BLEACHERSSETUP 10/6/2026- REMOVE 10/12/2026ASSEMBLY · 2026-09-09

101088106 ACTIVE

PERMIT EXPIRES ON 11/09/2026 ERECTION STARTS: 10/7/2026, ERECTION ENDS: 10/12/2026. CHICAGO MARATHON PHOTO BRIDGE BOOM TOWERSTRUCTURES- PEER REVIEW- REINSTATE 101060270 SELF-CERT, 1 DAY EVENT OCTOBER 11, 2026ERECT TWO (2) STRUCTURES- ONE (1) 16X12X8 BOOM TOWER PLATFORM, ONE (1) - 54X16X22.75 PHOTO BRIDGESETUP 10/7/2026- REMOVE 10/12/2026ASSEMBLY · 2026-09-09

101088105 ACTIVE

PERMIT EXPIRES ON 11/09/2026 ERECTION STARTS: 9/24/2026, ERECTION ENDS: 10/16/2026. CHICAGO MARATHON BOX TRUSS STRUCTURESSTRUCTURES- PEER REVIEW- REINSTATE 101073748, SELF-CERT, 1 DAY EVENT OCTOBER 11, 2026ERECT THREE (3) STRUCTURES, ONE (1) 65X7X19.5 START LINE BOX TRUSS, 54X12X15.5 FINISH LINE LED BOX TRUSS, 52X24X18.5 PLATFORM AND BOX TRUSS.SETUP 9/24/2026- REMOVE 10/16/2026ASSEMBLY · 2026-09-09

101088110 ACTIVE

PERMIT EXPIRES ON 11/09/2026 ERECTION STARTS: 9/24/2026, ERECTION ENDS: 10/16/2026. CHICAGO MARATHON BOX TRUSS STRUCTURESTRUCTURE, SELF-CERT,1 DAY EVENT OCTOBER 11, 2026ERECT ONE (1) 5 X7.X 17 12" BOX TRUSS TOWER STRUCTURESETUP 9/24/2026- REMOVE 10/16/2026ASSEMBLY · 2026-09-09

101088103 ACTIVE

PERMIT EXPIRES ON 11/09/2026 ERECTION STARTS: 9/24/2026, ERECTION ENDS: 10/16/2026. CHICAGO MARATHON STAGE STRUCTURESSTAGES- REINSTATE PERMIT 101073740 SELF-CERT, 1 DAY EVENT OCTOBER 11, 2026ERECT TWO (2) STRUCTURES, ONE (1) 20X20X3 BIL-JAX STAGE, AND ONE (1) 20X80X3 WITH 16X24X3 BUMPOUT START LINE BIL-JAX STAGE..SETUP 9/24/2026- REMOVE 10/16/2026ASSEMBLY · 2026-09-09

101088100 ACTIVE

PERMIT EXPIRES ON 11/09/2026 ERECTION STARTS: 9/24/2026, ERECTION ENDS: 10/16/2026. CHICAGO MARATHON SMALL TENTSTENTS- SELF-CERT, 1 DAY EVENT OCTOBER 11, 2026ERECT THIRTY-ONE (31) STRUCTURES, ONE (1) 10X30 FRAME, ONE (1) 16X15 FRAME, ONE (1) 20X20 FRAME, EIGHT (8) 20X30 FRAME, THREE (3) 20X40 FRAME, ONE (1) 20X60 FRAME, ONE (1) 20X80 STRUCTURE, ONE (1) 20X140 STRUCTURE, ONE (1) 30X20 STRUCTURE, ONE (1) 30X30 FRAME, ONE (1) 30X40 STRUCTURE, TWO (2) 30X60 FRAME, THREE (3) 30X60 STRUCTURE, ONE (1) · 2026-09-09

101087187 ACTIVE

PERMIT EXPIRES ON 10/13/2026 ERECTION STARTS: 8/27/2026, ERECTION ENDS: 8/31/2026. SELF CERT CBC 2019 - 2026 PANDA FEST CHICAGO STAGE AND TENTS AT BUTLER FIELD ON AUG 28-30, 2026. SETUP AUG 27 AND TAKEDOWN AUG 31, 2026. 1-SL100 MOBILE STAGE WITH WINGS AND FIVE 40X40 TENTS. CSEM WITH DRAGONFEST LLC. · 2026-08-13

101086473 ACTIVE

PERMIT EXPIRES ON 09/29/2026 ERECTION STARTS: 7/24/2026, ERECTION ENDS: 8/4/2026. C3 LIVE NATION - LOLLA 2026 ULTA STRUCTURESTRUCTURE- PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 40¿X36.5'X16.75' MODTRUSS STRUCTURE (40X40 FOOT PRINT)SETUP 7/24/26- REMOVE 8/4/26 ASSEMBLY · 2026-07-29

101086184 ACTIVE

PERMIT EXPIRES ON 09/29/2026 ERECTION STARTS: 7/24/2026, ERECTION ENDS: 8/3/2026. C3 LIVE NATION - LOLLA 2026 HOLLISTER STRUCTURESTRUCTURE- PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 40¿X29¿X16¿ MODIFIED CARGO CONTAINERS, FRAMED STRUCTURESETUP 7/24/26- REMOVE 8/3/26 ASSEMBLY · 2026-07-29

101086472 ACTIVE

PERMIT EXPIRES ON 09/29/2026 ERECTION STARTS: 7/24/2026, ERECTION ENDS: 8/4/2026. C3 LIVE NATION - LOLLA 2026 NEUTROGENA STRUCTURESTRUCTURE- PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 20X30X12 BOX TRUSS STRUCTURE 32X32 FOOT PRINTSETUP 7/24/26- REMOVE 8/4/26 ASSEMBLY · 2026-07-29

101086467 ACTIVE

PERMIT EXPIRES ON 09/28/2026 ERECTION STARTS: 7/28/2026, ERECTION ENDS: 8/4/2026. REACH - LOLLA 2026 TOYOTA BOX TRUSS STRUCTURE- PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 66X10X22 BOX TRUSS STRUCTURESETUP 7/28/26- REMOVE 8/4/26 ASSEMBLY · 2026-07-28

101085592 ACTIVE

PERMIT EXPIRES ON 09/24/2026 ERECTION STARTS: 7/24/2026, ERECTION ENDS: 8/9/2026. C3 PRESENTS LOLLAPALOOZA PERRY SUITESSTRUCTURE -PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT TWO (2) STRUCTURES- TWO (2) 8X20X18 DOUBLE STACK MODIFIED CONTAINER STRUCTURES.SETUP 7/24/2026 REMOVE 8/9/2026ASSEMBLY · 2026-07-24

101086187 ACTIVE

PERMIT EXPIRES ON 09/24/2026 ERECTION STARTS: 7/24/2026, ERECTION ENDS: 8/3/2026. THE BAIT SHOPPE - LOLLA 2026 BUD LIGHTSTRUCTURE- PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 8X20X9.3 CARGO CONTAIN WITH SECOND LEVEL, ONE (1) 4X7X20 MARQUEE SIGNSETUP 7/24/26- REMOVE 8/3/26 ASSEMBLY · 2026-07-24

101086185 ACTIVE

PERMIT EXPIRES ON 09/24/2026 ERECTION STARTS: 7/27/2026, ERECTION ENDS: 8/3/2026. C3 LIVE NATION - LOLLA 2026 LOL SURPRISE STRUCTURESTRUCTURE- SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 24X20 X12 MODIFIED CARGO CONTAINER STRUCTURESETUP 7/27/26- REMOVE 8/3/26 ASSEMBLY · 2026-07-24

101085589 ACTIVE

PERMIT EXPIRES ON 09/24/2026 ERECTION STARTS: 7/23/2026, ERECTION ENDS: 8/9/2026. C3 PRESENTS LOLLAPALOOZA ADA PLATFORMSPLATFORM - SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT TWO (2) PLATFORMS- ONE (1) 40X24 ADA PLATFORM, ONE (1) 48X32 ADA PLATFORMSETUP 7/23/2026 REMOVE 8/9/2026ASSEMBLY · 2026-07-24

101086183 ACTIVE

PERMIT EXPIRES ON 09/23/2026 ERECTION STARTS: 7/24/2026, ERECTION ENDS: 8/3/2026. C3 LIVE NATION - LOLLA 2026 GILDAN COMFORT COLORS STRUCTURESTRUCTURE- PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 37.33 X20 X 15 MODIFIED SHIPPING CONTAINER STRUCTURESETUP 7/24/26- REMOVE 8/3/26 ASSEMBLY · 2026-07-23

101086186 ACTIVE

PERMIT EXPIRES ON 09/23/2026 ERECTION STARTS: 7/24/2026, ERECTION ENDS: 8/4/2026. C3 LIVE NATION - LOLLA 2026 PATRON STRUCTURE TWO STORY STRUCTURESTRUCTURE- REINSTATE 101071860, PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 36.5X 40.5'X 23.5' 2 STORY STRUCTURE. SETUP 7/24/26- REMOVE 8/4/26 ASSEMBLY · 2026-07-23

101086180 ACTIVE

PERMIT EXPIRES ON 09/23/2026 ERECTION STARTS: 7/24/2026, ERECTION ENDS: 8/4/2026. C3 LIVE NATION - LOLLA 2026 CASA BACARDISTRUCTURE- PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 40X 43.33'X 29' 2 STORY BOX TRUSS STRUCTURE.SETUP 7/24/26- REMOVE 8/4/26 ASSEMBLY · 2026-07-23

101086190 ACTIVE

PERMIT EXPIRES ON 09/23/2026 ERECTION STARTS: 7/27/2026, ERECTION ENDS: 8/3/2026. CORSO MILLNER GROUP- LOLLA 2026 RED BULL TRUSSSTRUCTURE- SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 36X20X18 TRUSS STRUCTURESETUP 7/27/26- REMOVE 8/3/26 ASSEMBLY · 2026-07-23

101086181 ACTIVE

PERMIT EXPIRES ON 09/23/2026 ERECTION STARTS: 7/24/2026, ERECTION ENDS: 8/5/2026. LOLLAPALOOZA - COKE COLA STUDIO STRUCTURESTRUCTURE- REINSTATE 101056076, PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 48'X48'X22' STRUCTURE (FOOT PRINT) 1940SF, 40' DIA 20.5 BOX TRUSS ON 6 STL. POSTS. SETUP 7/24/2026 - REMOVE 8/5/2026ASSEMBLY · 2026-07-23

101086189 ACTIVE

PERMIT EXPIRES ON 09/23/2026 ERECTION STARTS: 7/25/2026, ERECTION ENDS: 8/5/2026. NVE EXPERIENCE AGENCY - LOLLA 2026 LIQUID IV STRUCTURESTRUCTURE- SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 30X30X11.5 PANEL STRUCTURESETUP 7/25/26- REMOVE 8/5/26 ASSEMBLY · 2026-07-23

101086188 ACTIVE

PERMIT EXPIRES ON 09/23/2026 ERECTION STARTS: 7/24/2026, ERECTION ENDS: 8/3/2026. BLACK OPS PRODUCTION- LOLLA 2026 GOOGLE STRUCTURE- PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 24X24X11 BOX TRUSS STRUCTURE WITH SHADE SAIL (OVER ALL 53X32) 1392 SF SETUP 7/24/26- REMOVE 8/3/26 ASSEMBLY · 2026-07-23

101086182 ACTIVE

PERMIT EXPIRES ON 09/23/2026 ERECTION STARTS: 7/27/2026, ERECTION ENDS: 8/3/2026. LOLLAPALOOZA - COKE LOUNGE STRUCTURE STRUCTURE- REINSTATE 101071862, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT ONE (1) 43 X27 X 13' 20.5 BOX TRUSS STRUCTURE.SETUP 7/27/2026 - REMOVE 8/3/2026ASSEMBLY · 2026-07-23

101085587 ACTIVE

PERMIT EXPIRES ON 09/23/2026 ERECTION STARTS: 7/21/2026, ERECTION ENDS: 8/9/2026. C3 PRESENTS LOLLAPALOOZA PERRY STAGE AND ENTRY STRUCTURESTAGE STRUCTURES- REINSTATE 101021810 PEER REVIEW, SELF-CERT, 4 DAY EVENT (JULY 30, 2026 - AUGUST 2, 2026)ERECT SIX (6) STRUCTURES- ONE (1) 47.6X8X19.5 ENTRY SCAFFOLD STRUCTURE, ONE (1) 62X48X58.5 STAGE TOTAL DECK 120X48 WITH RIGHT AND LEFT STAGE, RIGHT WING LOADING, ONE (1) 24X36X12 FRONT OF HOUSE, ONE (1) 29X26X31.5 FOH SPOT STRUCTURE, AND TWO (2) 6.5X6X40 · 2026-07-23

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.