SELF CERT 2019 CBC: INTERIOR ALTERATIONS TO EXISTING 1ST, 2ND & 3RD FLOOR OF HOSPITAL TO INCLUDE IMAGING EQUIPMENT REPLACEMENTS AS PER PLANS (OCCUPANCY I-2 & B, TYPE IA CONSTRUCTION) · 2026-07-29
SPR 2019 CBC: INTERIOR ALTERATIONS TO EXISTING 3RD FLOOR OF HOSPITAL TO EXPAND THE STERILE STORAGE AND RENOVATE THE DECONTAMINATION AREA AS PER PLANS (OCCUPANY I-2, TYPE IA CONSTRUCTION) · 2026-05-28
SPR 2019 CBRC - REMOVE EXISTING CHILLER AND INSTALL NEW CHILLER ON THE ROOFTOP OF AN EXISTING HOSPITAL. (STRUCTURAL PEER REVIEW) (CONSTRUCTION TYPE IA, OCCUPANCY CLASSIFICATION I2) · 2026-02-27
REPLACEMENT OF HOIST CABLES ON ONE(1) 2500LB CAPACITY, 11-FLOOR, 350FPM, PASSENGER ELEVATOR(#2), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(EV003421) · 2026-01-21
DUCTWORK EXTENSION/RECONFIGURATION, REPAIR/REPLACEMENT AFFECTING 1 SYSTEMS : 1 CHILLER(CARRIER / 19XRV6667C69VHE64 / 13TH FLOOR MECHANICAL ROOM) . ELECTRICAL WORK UNDER THIS PERMIT = YES . LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), 13TH FLOOR MECHANICAL ROOM. · 2025-12-30