PERMIT EXPIRES ON 09/30/2026 ERECTION STARTS: 8/2/2026, ERECTION ENDS: 8/4/2026. SELF CERT. CBC2019. REINSTATEMENT OF 2022 PERMIT 100981464 FOR THE 2026 NORTHWESTERN FEINBERG SCHOOL OF MEDICINE TENT AT MCA COURTYARD ON AUG 3, 2026. SET-UP ON AUG 2 AND TAKEDOWN IS AUG 4TH. SAME 1-40X65 TENT. PARTYTIME-HDO OPERATIONS LLC. · 2026-08-03
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: INSTITUTIONAL. START DATE: 5/21/2026. END DATE: 11/17/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST. · 2026-05-26
LIKE FOR LIKE CONTROLLER REPLACEMENT DUE EXISTING CONTROLLER COMPONENETS BEING OBSOLETE, ON ONE(1) 12000LB CAPACITY, 4-FLOOR, 150FPM, HYDRAULIC, FREIGHT ELEVATOR(#4), PURSUANT TO THE SCOPE OF WORK SUBMITTED. FIRE SERVICE PHASE II MANDATE DOES APPLY TO THIS INSPECTION.(100850720) · 2026-04-13
PERMIT EXPIRES ON 06/01/2026 ERECTION STARTS: 4/2/2026, ERECTION ENDS: 4/15/2026. SELF CERT - CBC 2019 - 2026 MCA ART EDGE - EXTRA TENTS IN THE REAR COURTYARD MUSEUM OF CONTEMPORARY ART ON APRIL 11 2026. SETUP IS 4-2-26 AND TAKEDOWN IS 4-15-26. 1-50FT X 20FT BAR TENT AND 1-50FT X 10FT BAR TENT. BLUE PEAK TENTS. · 2026-04-01
LINE VOLTAGE ELECTRICAL WORK. INSTALL TEMPORARY 125 KW DIESEL GENERATOR. RECEPTACLE OUTLETS: 0 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: TEMPORARY EVENT TENT. · 2026-03-27
PERMIT EXPIRES ON 04/25/2026 ERECTION STARTS: 4/2/2026, ERECTION ENDS: 4/15/2026. SELF CERT - CBC 2019 - PEER REVIEW - REINSTATEMENT OF 2025 PERMIT 101068952 FOR THE 2026 MCA ART EDGE TENT EVENT IN THE REAR COURTYARD MUSEUM OF CONTEMPORARY ART ON APRIL 11 2026. SETUP IS 4-2-26 AND TAKEDOWN IS 4-15-26. SAME 1-66FT X 139FT TENT, 1-30FT X 20FT TENT AND 1-20FT X 40FT TENT. BLUE PEAK TENTS. · 2026-02-25
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: INSTITUTIONAL. START DATE: 11/21/2025. END DATE: 5/20/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST. · 2025-11-24