Permits at 200 N STATE ST

2 permits on file · Chicago, IL · from the official municipal record

101081959 ACTIVE

WORK IS TO INCLUDE CONSTRUCTION OF AN ELEVATED TRANSIT STATION ON THE LOOP ELEVATED LINE AT STATE STREET AND LAKE STREET, AND ALSO IMPROVEMENTS AT THE LAKE RED LINE SUBWAY STATION. THE WORK FOR THE ELEVATED LINE WILL INCLUDE A PHASED DEMOLITION OF THE EXISTING STATE/LAKE STATION, CONSTRUCTION OF AN EIGHT CAR PLATFORM WITH A FARE COLLECTION AREA, FOUR ELEVATORS, TWO ESCALATORS, FLYOVER BRIDGE AND CANOPY, CIVIL SITE WORK AS IT RELATES TO UTILITY CONNECTIONS, UTILITY RELOCATION, VAULTED SIDEWALK MO · 2026-04-09

101068938 Unknown

WRECK AND REMOVE THE EXISTING ELEVATED CTA STATION AT STATE AND LAKE INCLUDING STAIRWELL. REMOVE SUBWAY PLATFORM (EXCLUDING STEEL COLUMN SHORING). WORK MAY NOT COMMENCE BEFORE JANUARY 5, 2026 · 2025-12-10

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.