SPR 2019 CBRC: CPS BERNHARD MOOS ES - PLAYGROUND REPLACEMENT, NEW TURF FIELD, NEW SPORT FIELDS, NEW ORNAMENTAL FENCE AND PEDESTRIAN GATES, AND PLANT MATERIAL. ELECTRICAL WORK: ADDING SECURITY CAMERAS, AND CONDUIT&WIRE TO THE EXISTIGN MDF ROOM. NO CHANGE IN EXISTING OCCUPANCY (E-1, ELEMENTARY SCHOOL) AND CONSTRUCTION TYPE (I-B). · 2026-07-28
APPROVAL OF NEW PLAN FOR STORMWATER MANAGEMENT. PROJECT TYPE: SCHOOL (K-12). PROJECT AREA: 2.07 ACRES. THIS APPROVAL DOES NOT AUTHORIZE ANY CONSTRUCTION WORK. CONSTRUCTION WORK MAY REQUIRE SEPARATE PERMIT(S). · 2026-06-09
LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL SECURITY. INSTALL SECURITY. SPECIFIC LOCATION: MDF AND MAIN ENTRIES. · 2026-05-12
SC 2019 CBRC: CPS SCHOOL, NO CHANGE IN USE. REPLACEMENT OF ROOFTOP CHILLER EQUIPMENT ATOP 3-STORY ELEMENTARY SCHOOL BUILDING, AND ASSOCIATED STRUCTURAL SUPPORT, MECHANICAL PIPING, ELECTRICAL, AND ARCHITECTURAL FINISHES. (OCCUPANCY GROUP E-1; CONST. TYPE 1B) · 2026-04-28