SPR 2019 CBRC: INTERIOR ALTERATIONS, REAR ADDITION AND CHANGE OF OCCUPANCY FROM RELIGIOUS ASSEMBLY (A-3) TO MULTI FAMILY RESIDENTIAL (R2) IN AN EXISTING 2-STORY BUILDING. ADDITION OF 8 DWELLING UNITS IN FULLY SPRINKLED 3 STORY BUILDING AND REAR ADDITION FOR ELECTRICAL AND WATER ROOM. EXTERIOR TRASH ENCLOSURE, EXTERIOR FENCING, 4 PARKING SPACES AND 8 BIKE PARKING SPACES IN TRANSIT SERVED LOCATION.(OCCUPANCY GROUP R-2; TYPE III-A CONSTRUCTION)**CERTIFIED CORRECTIONS SUBJECT TO FIELD INSPECTIONS & · 2026-08-21
SCOPE: NONSTRUCTURAL INTERIOR PREPARATORY DEMOLITION OF NON-LOAD BEARING WALLS AND M.E.P. SYSTEM WITH DEMO DRAWINGS AND ALL OTHER WORK TO BE PERFORMED ON SPR APPLICATION/PERMIT #101081518.LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), FIRST AND SECOND FLOOR. · 2026-05-01