Permits at 1401 S SACRAMENTO DR

8 permits on file · Chicago, IL · from the official municipal record

101088343 ACTIVE

PERMIT EXPIRES ON 11/11/2026 ERECTION STARTS: 9/9/2026, ERECTION ENDS: 9/24/2026. RIOT FEST 2026- Q101 TOWER STRUCTURESTRUCTURE- SELF CERT- 3 DAY EVENT (9/18-20/2026)ERECT ONE (1) 11¿X11¿X31.6¿ TOWER STRUCTURE.SETUP 9/9/2026 - REMOVE 9/24/2026ASSEMBLY · 2026-09-11

B200510754 ACTIVE

LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 1 . LIGHTING OUTLETS: 0. SPECIFIC LOCATION: DOUGLAS PARK. · 2026-09-09

101087705 ACTIVE

PERMIT EXPIRES ON 10/27/2026 ERECTION STARTS: 9/10/2026, ERECTION ENDS: 9/23/2026. SELF CERT. CBC2019 - 2026 RIOT FEST 3 MOBILE STAGES AT DOUGLASS PARK ON SEPT 18-20, 2026. SETUP SEPT 10 AND TAKEDOWN SEPT 23, 2026. 2-SAM575 50FT X 40FT MOBILE STAGES WITH WINGS AND 1-SL320 40FT X 40FT MOBILE STAGE WITH WINGS. RIOT FEST CORP WITH BIGTENT EVENTS. · 2026-09-03

101087373 ACTIVE

PERMIT EXPIRES ON 10/31/2026 ERECTION STARTS: 9/8/2026, ERECTION ENDS: 9/24/2026. RIOT FEST 2026- TENT PLATFORMTENT PLATFORM- PEER REVIEW- 3 DAY EVENT (9/18-20/2026)ERECT ONE (1) 150X50 RING LOCK TIERED PLATFORM WITH ONE (1) 30X150 (9MX45M) STRUCTURE.SETUP 9/8/2026 - REMOVE 9/24/2026ASSEMBLY · 2026-08-31

101087678 ACTIVE

PERMIT EXPIRES ON 10/27/2026 ERECTION STARTS: 9/9/2026, ERECTION ENDS: 9/23/2026. CBC2019 - PEER REVIEW - REINSTATEMENT OF 2025 RIOT FEST DOUBLE STAGE PERMIT 101073628 AT DOUGLASS PARK FOR THE 2026 RIOT FEST DOUBLE STAGE ON SEPT 18-20, 2026 WITH SETUP SEPT 9 AND TAKEDOWN SEPT 23, 2026. SAME 1- 252FT X 64FT DOUBLE STAGE WITH SOUND TOWERS. RIOT FEST CORP. WITH BIGTENT EVENTS. · 2026-08-27

101087635 ACTIVE

PERMIT EXPIRES ON 10/25/2026 ERECTION STARTS: 9/17/2026, ERECTION ENDS: 9/21/2026. RIOT FEST 2026- MONSTER TRAILER IDOT APPROVEDTENT- 3 DAY EVENT (9/18-20/2026)ERECT ONE (1) 53X8.5X13.5 TRAILER, FOLDS OUT TO 40X24 PLATFORM STRUCTURESETUP 9/17/2025 - REMOVE 9/21/2026ASSEMBLY · 2026-08-25

101087372 ACTIVE

PERMIT EXPIRES ON 10/20/2026 ERECTION STARTS: 9/8/2026, ERECTION ENDS: 9/24/2026. RIOT FEST 2026- SMALL TENTSTENT- 3 DAY EVENT (9/18-20/2026)ERECT FIFTY (50) STRUCTURES, ONE (1) 10X50 FRAME, FOUR (4) 10X60 FRAME, ONE (1) 10X70 FRAME, ONE (1) 10X100 FRAME, ONE (1) 10X170 FRAME, ONE (1) 10X320 FRAME, ONE (1) 15X30 FRAME, THREE (3) 20X30 FRAME, NINE (9) 20X40 FRAME, ONE (1) 20X40 POLE, FIVE (5) 20X60 FRAME, SEVEN (7) 20X80 FRAME, ONE (1) 20X100 FRAME, ONE (1) 20X120 FRAME, ONE (1) 30X30 FRAME, ONE · 2026-08-20

B200474987 ACTIVE

TUCKPOINTING AND UNIT MASONRY REPAIR / REPLACEMENT: 340 SQ. FT., LINTEL QTY. 0, MAX. LENGTH 0. LOCATION: CHIMNEY ON EAST ELEVATION. · 2026-06-24

Monitoring a permit at this address?

Open any permit above and Permit Ping will watch it for you — a daily check of the official record with an email the moment the status changes. Free for up to 3 permits.