PERMIT EXPIRES ON 08/09/2026 ERECTION STARTS: 05/28/2026, ERECTION ENDS: 06/10/2026.SELF-CERT - CBC 2019. FESTIVAL TENTS AND TEMPORARY INSTALLATIONS AT HUNTINGTON PAVILLION NORTHERLY ISLAND FOR THE BEYOND WONDERLAND FESTIVAL ON JUNE 6-7TH, 2026. SET-UP IS MAY 28TH AND TAKEDOWN IS JUNE, 10TH. OVERALL AREA: 24,494 SQ.FT. INCLUDING:1.) P10 TENT: 164X132= 21,648 SF2.) VIP TRUSS PORTAL: 21X3=63 SF3.) MAD HATTER ART INSTALL: 23 DIAMETER = 415 SF4.) INFLATABLE MUSHROOM ART INSTALL: 4X4=16 SF X 5=80 SF5 · 2026-06-12
PERMIT EXPIRES ON 08/08/2026 ERECTION STARTS: 05/28/2026, ERECTION ENDS: 06/10/2026. SELF-CERT - CBC 2019. FESTIVAL TENTS AND TEMPORARY STAGES AT HUNTINGTON PAVILLION NORTHERLY ISLAND FOR THE BEYOND WONDERLAND FESTIVAL ON JUNE 6-7TH, 2026. SET-UP IS MAY 28TH AND TAKEDOWN IS JUNE, 10TH. OVERALL AREA: 22,728 SQ.FT. INCLUDING:1.) P1 TENT WITH STAGE 4: 99 X147 =14,553 SF2.) P5 TENT: 79 X 49= 3,871 SF3.) STAGE 2: 2,384 SF4.) STAGE 3: 1,920 SF5.) 40FT STACKED SHIPPING CONTAINERS: 40 X 8 = 320 X 7= 2,2 · 2026-06-08
PERMIT EXPIRES ON 08/04/2026 ERECTION STARTS: 06/03/2026, ERECTION ENDS: 06/10/2026. SELF-CERT - CBC 2019. FESTIVAL TENTS AT HUNTINGTON PAVILION NORTHERLY ISLAND FOR THE BEYOND WONDERLAND FESTIVAL ON JUNE 6-7TH, 2026. SET-UP IS JUNE 3RD AND TAKEDOWN IS JUNE, 10TH. 1-30X60, 2-30X30, 1-40X40, 1-20X80, 2-10X70, 1-10X60, 1-10X100, 1-10X310 = 12,900 SF TOTAL. INSOMNIAC WITH PRO EM NATIONAL EVENT SERVICES. · 2026-06-04
LINE VOLTAGE ELECTRICAL WORK. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. NEW PERMANENT 200 AMP SERVICE DISCONNECTING MEANS WITH 2 CIRCUITS. N · 2026-05-26
PERMIT EXPIRES ON 07/06/2026 ERECTION STARTS: 6/3/2026, ERECTION ENDS: 6/18/2026. SELF CERT. CBC 2019. PEER REVIEW. RED BULL SPINOFF EVENT TEMP. STRUCTURES AT 12TH ST BEACH ON 6-13-26. SETUP JUNE 3 AND TAKEDOWN 6-18-26. 1- 20FTX12FT RAISED JUDGE PLATFORM, 1-460FT LONG RAISED PLATFORM WITH 14FT SCENIC LIGHTHOUSE AND BRANDING SIGNS, 2 - 35FT AUDIO TOWERS, 3 LED MOBILE VIDEO WALLS, 2 - 50FT DIA STAR WIGWAM TENT, AND 1- 45FTX20FT VIP TRUCK TENT. OZTECH MEDIA WITH CSEM. · 2026-05-06
PERMIT EXPIRES ON 07/06/2026 ERECTION STARTS: 5/4/2026, ERECTION ENDS: 10/17/2026. SELF CERT - CBC 2019 - PEER REVIEW. 2026 LIVE NATION SEASONAL BLEACHERS AND GRANDSTANDS AT HUNTINGTON BANK PAVILION FOR THE 2026 CONCERT SEASON (SAME SIZE AND LOCATION AS THE 2019-2025 PERMITS) ON MAY 16, 2026 THRU OCT 14, 2026. SETUP IS MAY 4 AND TAKEDOWN IS OCT 17, 2026. 1- 120FT X 43FT DOUBLE- DECKER GRANDSTAND WITH A 120FT X 15FT 5 ROW BLEACHER AND A 55FT X 50FT RAISED DECK AND 1- 115FT X 68FT 20 ROW TIP STAN · 2026-05-06
INSTALLATION OF ONE(1) TEMPORARY 750LB CAPACITY, 12FT RISE, 14FPM, VERTICAL WHEELCHAIR LIFT(5/16/2026 THRU 10/11/2026), PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED. · 2026-04-22
PERMIT EXPIRES ON 06/07/2026 ERECTION STARTS: 4/21/2026, ERECTION ENDS: 10/17/2026. CBC 2019 SELF CERT - REINSTATMENT OF 2025 PERMIT 101066236 FOR THE SAME 2026 LIVE NATION SUMMER CONCERT SMALL MERCH AND ENTRY TENTS ON MAY 16 - OCT 11 2026 AT NORTHERLY ISLAND HUNTINGTON PAVILION. SETUP IS APRIL 21 AND TAKEDOWN IS OCT 17, 2026. SAME 2-10X50S, 1-12.5X70, 2-20X30S, 3-20X40S, 1-20X60 AND 1-30X60 SMALL TENTS. LIVE NATION WITH PARTYTIME-HDO OPERATIONS. · 2026-04-07
ELECTRICAL MAINTENANCE PERMIT. OCCUPANCY: ASSEMBLY. START DATE: 4/1/2026. END DATE: 9/28/2026. ALL WORK UNDER THIS PERMIT MUST BE PERFORMED BY EMPLOYEES OF THE LISTED ELECTRICAL CONTRACTOR. THE ELECTRICAL CONTRACTOR MUST MAINTAIN COMPLETE WRITTEN RECORDS OF ALL WORK PERFORMED UNDER THIS PERMIT AND MAKE THOSE RECORDS AVAILABLE TO THE BUILDING COMMISSIONER UPON REQUEST. · 2026-03-10