INSTALLATION OF THREE(3) 16-FLOOR, 500FPM, ONE(1) 4000LB CAPACITY, AND TWO(2) 3500LB CAPACITY, PASSENGER ELEVATORS, PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED. · 2026-04-01
INSTALLATION OF TWO(2) 8000LB CAPACITY, 19-FLOOR, 275FPM, RACK & PINION CONSTRUCTION HOIST, PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED. · 2026-03-13
***HOIST PERMIT*** INSTALLATION OF TEMPORARY DUAL 8000LBS RACK AND PINION CONSTRUCTION HOIST. · 2026-03-11
FIRE ALARM: NEW SYSTEM. ASSOCIATED BUILDING PERMIT:100982183. AFFECTS: 286 DWELLING UNITS; 1 NON-RESIDENTIAL UNITS. HIGH-RISE BUILDING: YES. VOICE COMMUNICATION: YES. SPECIAL LOCKING: NO. MONITORING TYPE: SUPERVISING STATION . SPECIFIC LOCATION: BASEMENT, 1-19. · 2026-02-24
TOWER CRANE - PHASES 2 & 3 - TIED-IN POTAIN MD 485B · 2026-02-19
DIRECT DEVELOPER SERVICES - 2019 CBC - REVISION TO PERMIT # 100982183 TO REPLACE ALL ELECTRICAL DRAWINGS AND REVISE SITE PLAN AND LANDSCAPE DRAWINGS TO REMOVE SIDEWALK CURBLANE BUMPOUT PER CDOT REQUIREMENT (CON TYPE IA FS OCC R2 S2 M B A3) CONSULTANT REVIEWER: GLOBETROTTERS ENGINEERING · 2026-01-21