NEW INSTALLATION OF ONE(1) 1400LB CAPACITY, 3-FLOOR, 30FPM, LULA, PURSUANT TO THE SCOPE OF WORK PLANS SUBMITTED. · 2026-08-03
INSTALLATION OF ONE (1) SET OF 8-1/2" HIGH BY 9' WIDE "VACHERON CONSTANTIN" AND 13-1/8" HIGH BY 13" WIDE LOGO SILHOUETTE ILLUMINATED FLAT CUT OUT LETTERS CONNECTING TO THE EXISTING ELECTRIC ON THE SOUTH ELEVATION. · 2026-06-11
SC 2019 CBRC: INTERIOR BUILD-OUT OF A RETAIL SALES TENANT ON THE FIRST AND SECOND FLOOR IN EXISTING 3-STORY BUILDING INCLUDING ASSOCIATED MEP WORK. (OCC. GRP. M; CONST. TYPE IIIA). AS PER PLANS. · 2026-04-06
SC 2019 CBRC: REHAB OF EXISTING 3-STORY RETAIL BUILDING WITH CRAWL SPACE. WORK TO INCLUDE: DEMO OF EXISTING INTERIOR, BUILD OUT OF NEW GROUND FLOOR SLAB, REMOVAL OF EXISTING OUTDOOR EGRESS STAIR & REPLACED WITH NEW EGRESS STAIR, THIRD FLOOR INTERIOR BUILDING OUT. INCLUDING ASSOCIATED MEP WORK. **STRUCTURAL PEER REVIEW** (OCC. GRP. M; CONST. TYPE IIIA). AS PER PLANS. · 2026-02-18