SELF-CERT 2019 CBRC: *STRUCTURAL PEER REVIEW* INSTALL NEW 19.73' H 4-SIDED CLOCK STRUCTURE AT THE SOUTH END OF GALLAGHER WAY. SCOPE INCLUDES ELECTRICAL, IN-GROUND LIGHTING, ANCHORING TO EXISTING SLAB BELOW GRADE AND PAVERS. · 2026-08-20
REPLACEMENT OF HOIST CABLES ON ONE(1) 3000LB CAPACITY, 9-FLOOR, 350FPM, PASSENGER ELEVATOR(#9), PURSUANT TO THE SCOPE OF WORK SUBMITTED.(100652791) · 2026-08-19
PERMIT EXPIRES ON 09/08/2026 ERECTION STARTS: 7/23/2026, ERECTION ENDS: 7/27/2026. FANS FIRST ENTERTAINMENTTENT- PEER REVIEW- 2 DAY EVENT 7/25-26/2026ERECT ONE (1) 60X82 (18MX25M) STRUCTURES TENT.ERECT 7/23/2026- REMOVE 7/27/2026ASSEMBLY · 2026-07-08
LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL LIGHTING. ALTER EXISTING LIGHTING. SPECIFIC LOCATION: NORTH CLARKE, WEST SIDE OF GALLAGHER WAY. · 2026-06-04
LOW VOLTAGE/COMMUNICATION ELECTRICAL WORK. INSTALL LIGHTING. SPECIFIC LOCATION: WRIGLEY GATE ON WEST SIDE OF GALLAGHER WAY. · 2026-05-29
SELF-CERT 2019 CBRC: ***STRUCTURAL PEER REVIEW*** CONSTRUCTION OF A NEW ARCHWAY AT THE WEST SIDE OF GALLAGHER WAY WITH BRICK PIERS AND DECORATIVE METAL TRUSS. SCOPE INCLUDES INTEGRAL LIGHTING AND DECORATIVE METAL PLAQUES, LOGO MEDALLIONS AND TEXT. NEW STRUCTURE TO SIT ATOP EXISTING CONCRETE FOUNDATIONS WITHIN EXISTING PLANTERS AND ON PRIVATE PROPERTY. NO CHANGE TO EXISTING OCCUPANCY IN GALLAGHER WAY. · 2026-03-27