DECOMMISSIONING / REMOVAL OF EXISTING COMMUNICATION EQUIPMENT. DECOMMISSIONING AND REMOVAL OF A WIRELESS SITE, INCLUDING COMPLETE REMOVAL OF ANTENNAS, EQUIPMENT, MOUNTS AND CABINETS. LOCATION: ROOFTOP. · 2026-08-31
SELF CERT: INTERIOR REMODEL TO CREATE INTERACTIVE VIRTUAL REALITY EXHIBITS IN TWO EXISTING GALLERIES ON THE THIRD FLOOR. THE WORK SHALL BE PRIMARILY ON THE THIRD FLOOR, WITH LIMITED ELECTRICAL WORK ON THE MEZZANINE LEVEL. THE WORK INCLUDES MINOR DEMOLITION TO REOPEN A DOOR INTO THE MAIN GALLERY 01 AND MINOR ELECTRICAL WORK. THE EXISTING, WALLS, FLOORS, DOORS, TRIM, ELEVATORS, EGRESS SIGNS, EMERGENCY LIGHTING AND STAIRWELLS SHALL REMAIN AS-IS. · 2026-02-05